Views: 0 Author: Site Editor Publish Time: 2026-06-18 Origin: Site
On flat concrete rooftops, site survey quality directly determines PV layout, annual yield, and O&M safety. Field measurement exposes shading risks that satellite maps and drawings often miss. Among all collected data, the heights of five vertical obstacles must be recorded one by one: parapet walls, roof penthouses (stair/elevator towers), ventilation fans, HVAC outdoor units, and rooftop billboards.
Parapet walls are the most common shading source on flat roofs. Their height scales linearly with the panel setback distance—a rule of thumb uses 1.5H to 2.5H clearance—so an oversized parapet sharply cuts usable area. Penthouses usually sit at the roof center or north side; both height and plan position must be logged. Roof fans, mostly for exhaust or fire safety, require recording impeller diameter, base height, and vibration envelope to keep panels out of the maintenance radius. HVAC units need count, single-unit dimensions, and bracket height; in southern climates, extra spacing for hot-air recirculation is necessary. Billboards on industrial roofs block south-facing sunlight with both panel face and columns, so their shadow path between 9:00 and 15:00 must be checked on the winter-solstice day.
Together with roof length, width, orientation, and load capacity, these five height datasets feed actionable PVSyst or SketchUp models. Missing any single height may cause string mismatch every afternoon before winter solstice, accumulating 5%–10% generation loss over a 25-year lifecycle.